Middle Marsyangdi, 70 MW |
|
Name of Project | Middle Marsyangdi Hydroelectric Project, 70 MW |
Project Location | Lamjung District, Gandaki Zone |
Employer | Nepal Electricity Authority, Generation Construction Department |
Scope of Works | |
Lot HSS | Design/drawing development, manufacturing, installation, testing and commissioning of complete of Hydraulic Steel Structures (Hydraulic Gates, Stop Logs, Trashrack and Steel penstocks) |
Lot M | Design/drawing development, manufacturing, workshop assembly, Testing, disassembly, Transportation of 2 units of 35 MW each Vertical Francis Turbine spiral casing and its components |
Lot E | Installation, testing and commissioning of 2 x 35 MW Generators, Control & Protection system and other electrical equipment |
Project Period | October 2002 – December 2008 |
Project Execution | NHE as nominated subcontractor for 1. Andritz Hydro GmbH, Austria for Lot HSS, 2. Voith Hydro GmbH, Germany for Lot M and 3. Alstom Power Generation AG, Germany for Lot E |
Consultant | Fichtner JV, Germany |