Middle Marsyangdi, 70 MW

Name of Project Middle Marsyangdi  Hydroelectric  Project, 70 MW 
Project Location Lamjung District, Gandaki Zone
Employer Nepal Electricity Authority, Generation Construction Department
Scope of Works  
Lot HSS    Design/drawing development, manufacturing, installation, testing and commissioning of complete of Hydraulic Steel Structures (Hydraulic Gates, Stop Logs, Trashrack and Steel penstocks)
Lot M Design/drawing development, manufacturing, workshop assembly, Testing, disassembly, Transportation of 2 units of 35 MW each Vertical Francis Turbine spiral casing and its components
Lot E Installation, testing and commissioning of 2 x 35 MW Generators, Control & Protection system and other electrical equipment
Project Period October 2002 – December 2008
Project Execution NHE as nominated subcontractor for 
1.    Andritz Hydro GmbH, Austria for Lot HSS,
2.    Voith Hydro GmbH, Germany for Lot M and
3.    Alstom Power Generation AG, Germany for Lot E
Consultant Fichtner JV, Germany